Our Projects

Our Latest and on-going Projects

UCLM University of Cebu Lapu-Lapu & Mandaue Campus

On-going UCLM 433kw ON-GRID project

Sonamco, Siaton Negros Oriental

Floating solar 242kw

GAISANO CAPITAL (GAISANO SAVERSMART) – T.PADILLA ST., CEBU CITY 214kWp SOLAR ON-GRID SYSTEM SET-UP

Ms. Ammie Fernandez (Left most)

Gaisano Capital Surigao – GM 

Mr. Tham Chee Aun

CEO – Ditrolic Solar, Malaysian (Partner with Magnus – Ditrolic)

Hon. Ernesto U. Magtugas Jr. 

Mayor of Surigao City

Engr. Augusto “jay-ar “ Reynes, jr.

Magnus-Ditrolic Solar COO 

RIBBON CUTTING

WITH OWNER, DOE &

MAYOR of DUMAGUETE CITY

THE PANELS

COMBINERS

INVERTERS, AC BREAKERS TRANSFORMER 

BUILDING 1 

SOLAR COWBOY’S IN ACTION

BUILDING 3 CLOSER LOOK

THE INVERTERS FOR BUILDING  1

BUILDING 3 

THE CABLE TRAYS

THE INVERTERS FOR BUILDING 3

THE INSTALLED PANELS

INVERTERS 1 & 2

INVERTERS 3, 4 & 5

THE INSTALLED PANELS

PV  WIRE TAGGING

THE TEAM DURING TURN-OVER

THE FLOORING

LABELLING

STRING TESTING

TAGGING

THE PV WIRES

CABLE TRAY

TIGHTINING

THE PANELS ABOVE CONCRETE SLABS

THE INVERTERS

 

100kWp SOLAR ON-GRID

THE ON-GRID INVERTERS

8 kWP HYBRID SOLAR

THE AC & DC BOXES

 EXPORT POWER MANAGER (EPM)

8 kWP HYBRID SOLAR WITH 200AH LITHIUM BATTERY

UN GROW INVERTER

SUN GROW INVERTER

ABB INVERTERS

THE INVERTERS

THE RIGHT WING PANELS 

THE LEFT WING PANELS 

PREVENTIVE MAINTENANCE

FLOATING

Phase 2 – 126.9kwp On-Grid

Phase 1 – 125kwp On-Grid

ROOFTOP

Phase 2 – 126.9kwp On-Grid

GOV. GWEN GARCIA’s  HOUSE

SUN VALLEY DRIVE

5kWp & 3kWp

additional ON-GRID

ARCHT. EDWIN SANICOLAS

Juan Luna Ave,

5kWp On-Grid & 3kWp

Hybrid Additional

MR. FRANCIS MANLAPUS

All Batteries Main office

Subangdako, Mandaue

5kWp plus 5kWp On-Grid

MR. R. CHUA

9th Street Doña Rosario Subdivision Mandaue

20kWp On-Grid

(5kWp per roof side)

DR. JONATHAN “BONG” PLAZA

Borbajo St., Talamban, Cebu City

8.0 kWp HYBRID with 200AH

Lithium LIFEPO4 Battery)

Scroll to Top